L. Antón Sánchez, J. Alcaraz, S. Rodríguez Ballesteros

This work studies an extended version of the multi-skill resource-constrained project scheduling problem that considers multiple resource efficiency rates and both fixed and skill-dependent variable costs, reflecting real project settings. The goal is to determine activity start times and assign (resource, skill) pairs to minimize the makespan while considering costs. As higher-skilled resources often incur higher costs, time and cost become conflicting objectives, leading to a multi-objective framework. Exact methods are computationally impractical even for small and medium instances. To address this, we propose a multi-objective metaheuristic with a novel encoding and tailored crossover and mutation operators that exploit problem knowledge. Computational results show that, for small and medium instances, the proposed method significantly outperforms exact approaches in runtime while achieving comparable solution quality, and it is the only practical option for large-scale problems.

Palabras clave: Multi-skill resource-constrained, Efficiency heterogeneity, Multi-objective metaheuristic

Programado

GT Heurísticas y metaheurísticas I
2 de septiembre de 2026  15:30
Aula 29


Otros trabajos en la misma sesión


Política de cookies

Usamos cookies solamente para poder idenfiticarte y autenticarte dentro del sitio web. Son necesarias para el correcto funcionamiento del mismo y por tanto no pueden ser desactivadas. Si continúas navegando estás dando tu consentimiento para su aceptación, así como la de nuestra Política de Privacidad.

Adicionalmente, utilizamos Google Analytics para analizar el tráfico del sitio web. Ellos almacenan cookies también, y puedes aceptarlas o rechazarlas en los botones de más abajo.

Aquí puedes ver más detalles de nuestra Política de Cookies y nuestra Política de Privacidad.